-
06/11/2026 Case Study
Integrated automation delivers record-speed factory launch for global snack food manufacturer
Actemium UK helped a leading international snack manufacturer achieve a record-speed launch of its new potato crisp factory in Asia, delivering integrated automation and process control systems across the production line. Drawing on extensive food manufacturing expertise, Actemium brought equipment from multiple suppliers together into a coordinated production system, reducing commissioning risk and helping the manufacturer achieve the product quality and process performance required for commercial production.Read more -
04/11/2026 Case Study
Future-proofing frozen food production through automation modernisation
Actemium UK delivered a complete automation and control systems modernisation across two high-capacity frozen food production lines, helping a major UK manufacturer overcome ageing technology, recurring stoppages and limited visibility of operational performance. Managing the project from initial engineering through to commissioning, Actemium integrated equipment and control systems across the manufacturing process to create a smarter, more reliable and future-ready operation. The upgrade improved production reliability, consistency and product quality control, while giving the customer greater operational insight and a scalable platform for future growth.Read more -
28/10/2026 Case Study
HV switchgear upgrade improves production reliability for leading brewery manufacturer
Actemium UK delivered a high-voltage (HV) switchgear upgrade for a leading UK brewery manufacturer, replacing obsolete electrical infrastructure that had become increasingly difficult to maintain and posed a growing operational risk. Working within a live production environment, Actemium designed and delivered a modern Schneider Electric switchgear solution that supported ongoing HV compliance and asset management – thus improving network reliability, enabling safer maintenance activities and reducing the risk of costly unplanned outages. The project was completed with minimal disruption to brewery operations.Read more -
12/10/2026 Case Study
Cyber-resilient SCADA transforms ride monitoring and maintenance at Thorpe Park
Recognised as the UK's most thrilling theme park, Thorpe Park wanted to improve visibility across its attractions, reduce downtime and give engineers faster access to the operational insights needed to keep rides running safely and reliably. Actemium UK delivered a centralised, cyber-resilient SCADA platform that brings information from eight roller coasters into a single interface, enabling real-time monitoring, faster fault response and more informed maintenance decisions. The solution has improved the client’s ride availability, strengthened OT cybersecurity and created a scalable foundation for future expansion.Read more -
23/09/2026 Case Study
Critical control systems at Yorkshire Water modernised without disrupting supply
Yorkshire Water needed to upgrade ageing control systems at Kirkhamgate Water Treatment Works while maintaining clean water production and meeting evolving cybersecurity requirements. Actemium UK delivered the complete migration, replacing obsolete PLC and HMI technology with a modern Mitsubishi Electric automation platform. The project improved reliability and maintainability, reduced operational and cybersecurity risk, and established a repeatable approach for future upgrades across Yorkshire Water's asset base.Read more -
07/09/2026 Case Study
Expanding ultra-rapid charging at Moto Exeter
Actemium UK has delivered the electrical and civil infrastructure for a new 24-bay Moto CHARGE ultra-rapid EV hub at Moto Exeter, one of the UK’s largest motorway charging destinations. Acting as Principal Contractor, Actemium completed the EV installation, including 12 ABB A400 chargers, a new 2 MVA substation, low-voltage distribution, feeder pillars and communications, alongside commissioning and ongoing maintenance support. Handed over on time following a 12-week onsite programme, the new hub was ready ahead of the busy summer holiday period, increasing ultra-rapid charging capacity for motorists travelling towards Devon and Cornwall and supporting the reliable, long-term operation of the motorway service area.Read more -
25/08/2026 Case Study
Supercharging one of the UK’s largest motorway EV charging hubs
Acting as Principal Contractor, Actemium UK advised, designed and delivered the end-to-end power and electrical infrastructure for a major new EV superhub at Moto Tamworth, one of the largest developments of its kind in the UK. Working with Moto Hospitality and GRIDSERVE at Junction 10 of the M42, Actemium combined its ICP, high-voltage electrical engineering, civil engineering and project delivery expertise to provide the capacity required for large-scale passenger and commercial EV charging.Read more -
29/07/2026 Case Study
Delivering flexible temporary power infrastructure for the UK naval sector
Actemium UK has delivered a bespoke Mobile Substation Container for a leading UK naval infrastructure client, supporting critical power resilience and operational continuity at HM Naval Base Portsmouth. Developed using Schneider Electric’s Okken low-voltage switchboard platform, the solution provides a highly flexible temporary power asset capable of supporting upgrades, maintenance works and future requirements across the site. The project demonstrates Actemium’s specialist expertise in delivering innovative, resilient electrical infrastructure solutions for mission-critical defence environments.Read more -
26/07/2026 Case Study
Control system upgrade improves safety and performance at Lianhetech Europe
Working in close partnership with chemical manufacturer Lianhetech Europe, Actemium UK successfully modernised a critical process control system at the company’s Seal Sands facility in Teesside in the United Kingdom. By upgrading an ageing Siemens PCS 7 environment to the latest supported version, Actemium helped improve system resilience, strengthen security and futureproof plant operations, all while minimising disruption to production.Read more -
22/07/2026 Case Study
Engineering reliable power distribution for coastal defence environments
Actemium UK has delivered a bespoke low-voltage power distribution solution for a major UK naval infrastructure client at HM Naval Base Devonport. Designed, manufactured and tested by Actemium’s specialist power engineering team, the feeder pillars provide reliable, resilient power distribution in a demanding naval setting while supporting critical operational and docking activities.Read more